Renewable Design for Arc Welded Steel Tube Steel Pipe - pn40 so en1092-1 flange – TOP-METAL Detail:
Quick Details
- Size: DN10-DN600
- Material: carbon steel,stainless steel
- Standard: EN1092-1 BS4504
- Place of Origin: Hebei, China (Mainland)
- Model Number: Slip on flange
- Brand Name: TM
- Standard or Nonstandard: Standard
- item: pn40 so en1092-1
- Surface: Anti-rust Oil ,yellow paint, black paint. electro-galvanized
- Flange facing: RF
- Technics: Forged
- Flange material: carbon steel,stainless steel
Packaging & Delivery
Packaging Details | pn40 so en1092-1: In ply-woonden case or pallet. |
---|---|
Delivery Time | Shipped in 30 days after payment |
pn40 so en1092-1
Product Description
Standard |
BS EN1092-1:2002 |
Type |
TYPE 12 Slip On (SO) |
Pressure |
PN2.5, PN6,PN10, PN16, PN25, PN40,PN63,PN100,PN160 |
Size |
DN10 – DN600, The p/t rating of all other flanges shall be agreed between the manufacturer and the purchaser. |
Material |
Carbon steel :A105,Rst37.2, C22.8, 20# ,Q235 Stainless steel : SS304/316/ 304L/316L |
Processing |
Forging |
Surface |
Rust-preventative oil, Black or yellow Painted, Plastic coated, Galvanized |
Packing |
Ply- wooden case or Pallet |
Prouduct Pictures
other types EN1092-1 BS4504 flanges
Processing
Business Scope
We supply and export various kinds of flanges, steel pipe(especially High grade pipeline steel ) ,butt-welding pipe fittings e.g. elbow, tee, reducer, cap. forged steel 3000lb 6000lb 9000lb pipe fittings, pipe couplings / nipples, , stainless steel fittings, customized steel parts etc. with 15years’ rich experience and advanced processing equipment.
1) Satisfied quality Buy cargo exactly you want.
2) Perfect service To ensure every order to go smoothly.
3) Workable prices Make your every cent to have its value.
4) Great cooperation Work with TOP-METAL will be a choice forever.
FAQ
(1)Q: Are you a trader or a factory?
A: We are both. As a trader, we have our own flange and fitting factory.
We could provide the original MTC for our client’s needs.
(2)Q: How many is your MOQ? What’s your payment term?
A: Generally speaking, we don’t have MOQ. Our price depends on the specific quantity. (The larger the quantity is, the better price will be.) Our common payment term is TT or L/C at sight, we could also discuss itaccordingly.
(3)Q: what’s your largest size of flange and fitting? How long is the production cycle?
A: The largest flange we could produce is OD2600mm and the largest fitting is OD820mm seamless. In general, we spend 20-25 days in a 20-ton order. If necessary, we could make it shorter.
(4)Q: Could you provide samples?
A: Sure. We could send you free samples, while the freight will be paid by the clients. Any needs, contact us freely.
(5)Q: What kind of certificates do you have?
A: We have ISO, TUV, API,BV etc.
click here to our home page~~~~
Product detail pictures:
Related Product Guide:
Versailles recap: episode two | Grade B Steel Pipe
Santa Cruz beach maintains ‘F’ grade, shows contamination improvement | Single End Nipple
Renewable Design for Arc Welded Steel Tube Steel Pipe - pn40 so en1092-1 flange – TOP-METAL, The product will supply to all over the world, such as: , , ,
By from -
By from -