professional factory for Carbon Steel Pipe Price Per Meter - din 2576 a105 c22.8 cs and ss forged plate flange – TOP-METAL Detail:
Quick Details
- Type: Flange
- Material: Carbon Steel,stainless steel
- Brand: TM
- Model: Plate Flange
- Item: din 2576 a105 c22.8 cs and ss forged plate flange
- Surface treatment: Yellow Paint
- Size: DN15–DN2400
- Place of Origin: Hebei
Packaging & Delivery
Packaging Details | din 2576 a105 c22.8 cs and ss forged plate flange: In ply-wooden case or pallet. |
---|---|
Delivery Time | Shipped in 0 days after payment |
din 2576 a105 c22.8 forged plate flange
Product Description
Standard |
DIN2573, DIN2576,DIN2502, DIN2503, DIN2527 |
Pressure |
DIN2573: 6 Bar (PN6) DIN2576: 10Bar (PN10) DIN2502: 16Bar (PN16) DIN2503: 25Bar 40Bar (PN25, PN40) |
Size |
DN10—DN2400 |
Type |
Plate (PL) |
Material |
Carbon steel :A105,Rst37.2, C22.8,20# ,Q235 Stainless steel :304/316/ 304L/316L |
Processing |
Forging |
Surface |
Rust-preventative oil, Black Painted ,Yellow painted, Galvanized |
Packing |
Ply- wooden case or Pallet |
Prouduct Pictures
Processing
Business Scope
We supply and export various kinds of flanges, steel pipe(especially High grade pipeline steel ) ,butt-welding pipe fittings e.g. elbow, tee, reducer, cap. forged steel 3000lb 6000lb 9000lb pipe fittings, pipe couplings / nipples, , stainless steel fittings, customized steel parts etc. with 15years’ rich experience and advanced processing equipment.
1) Satisfied quality Buy cargo exactly you want.
2) Perfect service To ensure every order to go smoothly.
3) Workable prices Make your every cent to have its value.
4) Great cooperation Work with TOP-METAL will be a choice forever.
FAQ
(1)Q: Are you a trader or a factory?
A: We are both. As a trader, we have our own flange and fitting factory.
We could provide the original MTC for our client’s needs.
(2)Q: How many is your MOQ? What’s your payment term?
A: Generally speaking, we don’t have MOQ. Our price depends on the specific quantity. (The larger the quantity is, the better price will be.) Our common payment term is TT or L/C at sight, we could also discuss itaccordingly.
(3)Q: what’s your largest size of flange and fitting? How long is the production cycle?
A: The largest flange we could produce is OD2600mm and the largest fitting is OD820mm seamless. In general, we spend 20-25 days in a 20-ton order. If necessary, we could make it shorter.
(4)Q: Could you provide samples?
A: Sure. We could send you free samples, while the freight will be paid by the clients. Any needs, contact us freely.
(5)Q: What kind of certificates do you have?
A: We have ISO, TUV, API,BV etc.
Click here to our home page~~~~
Product detail pictures:
Related Product Guide:
A Few Facts About Manufacturing Steel Pipes
The future of SIPPs – FCA responds to the Work and Pensions Committee | Carbon Steel Flange
professional factory for Carbon Steel Pipe Price Per Meter - din 2576 a105 c22.8 cs and ss forged plate flange – TOP-METAL, The product will supply to all over the world, such as: , , ,
By from -
By from -