PriceList for Welded Cement Lined Carbon Steel Pipe - forged carbon steel slip on hub flange – TOP-METAL Detail:
Quick Details
- Size: 1/2"-24"
- Material: Carbon Steel
- Standard: ANSI
- Place of Origin: Hebei, China (Mainland)
- Model Number: Slip-On
- Brand Name: TM
- Standard or Nonstandard: Standard
- item: forged carbon steel slip on hub flange
- type: Slip On (SO)
- Surface: Galvanized,Anti-rust oil,yellow paint, black paint.
- Pressure: 150lb,300lb,600lb,900lb,1500lb
- material: carbon steel
- standard: ANSI B16.5
- size: 1/2"-24"
- Processing: forging
- heat treatment: Normalizing, Annealing, Quenching+Tempering
- packing: Poly-wooden case or Pallet
Packaging & Delivery
Packaging Details | forged carbon steel slip on hub flange: In ply-wooden case or pallet with PE film. |
---|---|
Delivery Time | 25-30 days for 1×20' container |
forged carbon steel slip on hub flange
Product Description
Standard |
ANSI B16.5 |
Type |
Slip On (SO) |
Pressure |
Class 150, 300, 600, 900, 1200, 1500, 2500 |
Size |
1/2”-24” |
Material |
Carbon steel : ASTM A105,ASTM A350 LF1. LF2, CL1/CL2, A234, S235JRG2, P245GH P250GH, P280GHM 16MN, 20MN ,20# |
Stainless steel: ASTM A182 F304/304L F316/316L |
|
Processing |
Forging |
Packing |
Poly-wooden case or Pallet |
Surface |
Rust-preventative oil, Black Painted |
Flange Heat Treatment |
Normalizing, Annealing, Quenching+Tempering |
Prouduct Pictures
Processing
Business Scope
We supply and export various kinds of flanges, steel pipe(especially High grade pipeline steel ) ,butt-welding pipe fittings e.g. elbow, tee, reducer, cap. forged steel 3000lb 6000lb 9000lb pipe fittings, pipe couplings / nipples, , stainless steel fittings, customized steel parts etc. with 15years’ rich experience and advanced processing equipment.
1) Satisfied quality Buy cargo exactly you want.
2) Perfect service To ensure every order to go smoothly.
3) Workable prices Make your every cent to have its value.
4) Great cooperation Work with TOP-METAL will be a choice forever.
FAQ
(1)Q: Are you a trader or a factory?
A: We are both. As a trader, we have our own flange and fitting factory.
We could provide the original MTC for our client’s needs.
(2)Q: How many is your MOQ? What’s your payment term?
A: Generally speaking, we don’t have MOQ. Our price depends on the specific quantity. (The larger the quantity is, the better price will be.) Our common payment term is TT or L/C at sight, we could also discuss itaccordingly.
(3)Q: what’s your largest size of flange and fitting? How long is the production cycle?
A: The largest flange we could produce is OD2600mm and the largest fitting is OD820mm seamless. In general, we spend 20-25 days in a 20-ton order. If necessary, we could make it shorter.
(4)Q: Could you provide samples?
A: Sure. We could send you free samples, while the freight will be paid by the clients. Any needs, contact us freely.
(5)Q: What kind of certificates do you have?
A: We have ISO, TUV, API,BV etc.
Click here to our home page~~~~
Product detail pictures:
Related Product Guide:
FULL TEXT-The Charlevoix G7 Summit Communique | Non-Standard Steel Part
Doctor says ‘nipple play’ is all one in three women need to ORGASM | Non-Standard Steel Part
PriceList for Welded Cement Lined Carbon Steel Pipe - forged carbon steel slip on hub flange – TOP-METAL, The product will supply to all over the world, such as: , , ,
By from -
By from -